Scrum guide

Edit Task

To edit an existing task, click the Edit Task icon located in the Action column of the task list. This will open the Edit Task Form, which displays the current details of the selected task. Modify the required fields as needed. Fields marked as required must be filled before submitting the form. Check the milestone and dependencies before saving changes.

  • Milestone Name: The name of the milestone is already pre-filled and cannot be edited.
  • Task Name: Enter the name of the task to be added.
  • Task Description: Provide a detailed description of the task.
  • Start Date: Select the start date for the task.
  • End Date: Choose the expected completion date for the task.
  • Estimated Hours: Input the estimated number of hours required to complete the task.
  • Actual End Date: If applicable, specify the actual end date when the task was completed.
  • Task Dependency: Identify if the task is dependent on another task.
  • Task Dependency Description: Provide a brief description of the dependency task.
  • Priority: Select the task’s priority (e.g., High, Medium, Low).
  • Status: Set the current status of the task (e.g., Not Started, In Progress, Completed).
  • Completed Percentage: Specify the percentage of task completion.
  • Assignee: Assign the task to a team member.
Shopping Basket